Pricing
Prices Are Based On Space And Material Type.
Quarter-Load Pricing Starts At 1.5 yd³. Prices Are Subject To Tax. Additional Charges May Apply.
Instant Estimate
- Measure In Feet And InchesMeasure the actual length, width and height of one item or one pile in feet and inches.
- Enter Your MeasurementsFor one combined pile, enter its overall measurements once. For separate items or piles, add one row for each. Their volumes are added automatically.
- See Your EstimateSee your total and choose a pickup time on the next page.
What Is One Cubic Yard?
A Box 3 Feet Wide, 3 Feet Deep And 3 Feet High Holds 1 Cubic Yard. Our Truck Holds 15 Cubic Yards Per Load; We Handle Larger Projects With Multiple Loads.
Additional Services
Extra Labour & Access
Stairs, Hills, Tight Spaces, Basic Disassembly Or Removal From Fixtures, One Saw Cut, Shovelling, Distance From The Truck, Etc.
Elevator Access $25 Per Pickup.
$75Per Hour
Light Demolition
More Than One Cut.
$125Per Hour
Paint Recycling
$5Per Medium Can
Tire Recycling
$20Per Tire
Bed Pieces
Mattress, Box Spring, Bed Frame, Headboard, Footboard, Futon.
$20Per Piece
Additional Weight
For Abnormally Heavy Items That Exceeded The Weight Allowance. Drywall, Concrete, Soil, Etc.
$0.25–$0.75Per kg
Access Charges Are Added For Each Selected Option. Additional Charges May Apply To Items Or Services Not Listed.
LET’S MAKE ROOM
Ready For Pickup?
Pick A Time. We’ll Handle The Lifting.
